Risk Assessment
Group Members: Eric, Altin, Josh, Arbaaz Location: Heath park (estate)/Alleyway
Hazard
|
Person(s) at Risk
|
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
|
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
|
Risk Level
(Likelihood + Severity)
2
|
Measures to Take to Manage Risk
|
Risk Managed?
Y/N
|
Baseball bats could cause serious injury in use whilst running or in fighting scenes | Eric/ Public | 3 | 4 | 3.5 | Being more gentle whilst swinging the equipment and make sure that a lot of practice before the actual filming takes place | Y |
In the chase scene, we need to look where we are running and trip hazards | Eric, Arbaaz, Altin the public | 1 | 2 | 1.5 | While the chase scene occurs, running places where there are few people in order to avoid running into them/ be aware of surroundings | Y |
Have to be careful with their car and Eric crossing | Eric, Arbaaz, Altin Josh | 2 | 2 | 2 | Drive safe and slowly and ensure timing is correct | Y |
The camera can damaged or stolen | Eric, Arbaaz, Altin Josh | 2 | 5 | 3.5 | Make sure someone is keeping watch of the equipment at all times | Y |
No comments:
Post a Comment